Benefits
Reductions
- Reduced design time and costs
- Reduced shutdown
- Eliminates re-work time and costs
- Reduced on site testing
- Eliminates double handling
- Exotic metals can be welded off-site
- Installation clash analysis
- Fabrication & pre-assembly checking
- Better & Safer designs
- Better use of limited space
- Comprehensive site familiarisation
Cost Savings
- Reduction in design time costs
- Reduced dimensional control costs
- All the savings apparent from using dimensional control
- Elimination of most on site welding, testing and clashes
- Reduced re-work and barge time
- Increased operational time
- Elimination of preparation costs for PDMS /CAD models
- Saving in project costs from “drip feed” approach
- Company wide savings rather than project based
Benefits
- Minimal site visits
- Minimal travel or familiarisation time
- Greater productivity from the same number of staff
- Ability to generate an accurate design “first time”
- Ability to react quickly to design changes
- Fast and accurate preparation of as-built archive
- Ability to cross check measured data
- Multi discipline system